Secure the underlayment with nails that are at least 2 inches from the edge of the roof.
How to attach a staggered roof.
How to tie a additions roof to existing roof roof additions to existing roofs how to construct a roof from an exsisting shead how to change a roof line how to attach a deck roof to existing roof how to add a roof over porch attache porch roof on house attach shed roof to house adding a roof to screened in porch adding a roof to existing.
A simple and often used shed design incorporates a pitched roof which is an appropriate roof for asphalt shingles.
Cedar shakes install on the existing wood siding or a plywood.
Install the second course just like the first using the guidelines on the underlayment to get the correct overlap.
This flashing is typically field fabricated from a sheet of 26 ga.
Another method of installing a staggered butt slate roof is to use slates of different lengths.
Read moreinstalling roof battens.
Step flashing is used to provide a water tight connection where roofing adjoins a vertical juncture.
When an ice dam forms on a roof usually caused by poor attic insulation ventilation ice and water can work their way up under the shingles and leak back into the house.
To begin remove the old roof tile.
Bent into an l shape.
Galvanized sheet metal bent at a 90 degree angle i e.
Posted march 4 2017 filed under roof installation roof repair maintenance.
Besides being inexpensive asphalt.
If your roof has a steep slope install the battens next which are thin strips of material that run horizontally along the roof.
Contents1 marking up gauges in sets 2 cutting and fixing3 fixing to masonry4 counter roof battens marking up gauges in sets one of the biggest mistakes that people make when marking up gauges is to do them one at a time.
Staggered cedar shingles also known as cedar shakes add a rustic look when used as siding on one of more exterior walls of a house.
If you ll be installing step flashing in which one piece of flashing is placed over the first in a staggered way apply additional cement and the next piece of flashing.
Install the underlayment for the new roof tile next working with 10 foot sections at a time.
Attach it to the roof in the same way.