The roll is unwound and laid on the site of the future installation.
How do you lay rolled roofing.
How to properly install roll roofing.
For extra durability you may install roll roofing in two layers.
Step 3 apply the edge strips.
For this heat up the gas burner and push it to the edge of the site where it will be fixed.
Then apply roofing cement evenly around the roof edges where these strips are going to go.
Plan so that no two butt joints are closer than 2 feet from each other.
It also helps if you first install a layer of roofing felt.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
You need to place starter strips of roll roofing along all edges of the roof so start by cutting pieces of roofing about 18 inches wide.
Roll roofing is not very pliant or flexible in cold weather of fewer than 45 degrees fahrenheit and it can crack and break if.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
To seal a plumbing vent spread roofing.
Fix edge fabric roll.
The strips should always be horizontal.
How to apply roll roofing laying begins at the lowest point.