Most asphalt shingles are 3 feet 91 4 centimeters in length.
How do you lay out shingles on a roof.
When laying the shingles for the top row cut 6 inches 15 2 centimeters from the first shingle in the left corner of the roof using the utility knife.
To lay out the design for the shingles begin at the bottom of the roof and place a tape measure inch from the edge of the roof to ensure the shingles overhang the drip edge.
Now you can snap a new bond line to align the shingles on the other side.
Nail down the shingles as you go along.
Asphalt roofing shingles simply rely on the force of gravity to shed water from rain or snow melt.
3 tab shingles are the most common type of shingle they are typically 36 inches long in total.
To roof around a dormer or other obstruction install shingles all the way up and run at least one course past the obstruction.
Continue laying down.
Lay the next row of shingles directly on top of the first row making the row two tiles thick.
Metal roofing is also available in the form of shingles.
Asphalt roofing felt paper and nail it in place using 1 inch galvanized roofing nails.
If your roof s width is not an even multiple of the shingle s length you will have a partial piece on one end of each row.
From there you will need to lay down the start line for your shingles.
Many pros shingle in a vertical line up the roof because it s much faster.
The bottom row of shingles must hang past the edge of the roof.
Your first shingle will need to be centered along the chalk line that you.
Continue adding panels until the roof is covered.
If the roof shingles and all accessory roof components are arranged and overlapped with this in mind the roof should successfully shed water.
The first thing you need to do when figuring out how to put shingles on a roof is to determine which type of roofing shingles you need.
In the dictionary to shingle is defined as to lay out or arrange so as to overlap.
Whenever you are laying shingles it is always a good idea to go to the middle of the roof along the edge to begin with.
The bottom of these courses must be nailed higher than usual so you can slip shingles under them later.
This will help determine how the shingles will lay on the roof width.
If you hit a stack vent or chimney interlace the shingles with the flashing to allow water to run down the roof.
You may need to cut panels to fit angles using a circular saw with a metal saw blade.
You will do this with the shingles that were just recently cut to be tab less.
Lay the starter row of metal shingles at the drip edge and affix to the roof with metal roofing nails.
Continue laying your shingles horizontally up the roof.